EffecTech will be calibrating the gas measurement system on Shell’s new floating behemoth, “Prelude” the largest floating object ever created

Shell LogoLonger than four soccer fields and displacing six times much water as the largest aircraft carrier, the FLNG facility will be the biggest floating production facility in the world. Find out more

Published 18 May 2012  –  Related categories: Industry  –