EffecTech engineers have been on site at the GATE terminal

EffecTech engineers have been on site at the GATE terminal in Rotterdam this week. Both the gas quality measurements and flow measurements have been validated by the team.

Published 15 June 2012  –  Related categories: Contracts  –