| Clients |
|
|
Our Recent Project's
26 August 2011: Proficiency Testing Scheme 11Q2 Results Results for the second round of the Global Gas and LNG Proficiency Testing scheme have been reported today. 18 laboratories from around the World participated in this second round of the scheme. 2 June 2011: First Biogas Performance evaluation The first EffecTech Performance evaluation of a Biogas gas chromatograph was conducted in Europe today. The Encal 3000 chromatograph underwent the ISO 10723 performance evaluation in the Elster Instromet factory in Silvolde, NL to assess its performance for the measurement of biogas. Biogas differs from natural gas in the components and composition ranges and challenges the instrument manufacturers with the inclusion of oxygen which many natural gas instruments cannot measure routinely. Biogas generation and measurement continues to grow in popularity as it will form an important contribution to the EU’s renewable energy target of 20% renewable energy by 2020. 10 May 2011: Energy measurements at the GATE terminal, NL EffecTech has evaluated all the metering equipment and network entry instrumentation at the new GATE (Gas Access To Europe) terminal in Rotterdam this week. The GATE terminal is the first LNG terminal in the Netherlands and will be an important source of energy for the Netherlands and the rest of Europe.
|
Clients 



